Cavendish Avenue
Arch: Rodic Davidson Architects
CA: Andrew Goddard Associates
QS: Moulton Taggart
Eng: Croft Structural Engineers
Photography: Darren Merriman
This project in St John’s Wood has Westgreen performing a remedial stabilisation to a fragile structure. Working from the perimeter in, our scope of work encompasses a full methodology with movement monitoring ‒ following the satisfactory introduction of which, a removal of existing temporary propping and installation of various scaffolding, structural blockwork, and dry packed infills has been carried out.
The scheme has required the installation of 19 tonnes of structural steel over three separate mobile crane lifts, necessitating full road closures.